Step 1. I began construction by building the platform. This consists of laser cut parts that interlock together. Once the planking was stained with Hunterline Creosote, it was glued to the framework. |
Step 2. The laser cut matboard framework was assembled. |
Another view of the assembled framework. |
Step 4. I began assembly with this wall. |
Step 5. The second wall was added. |
Step 6. The front wall of the bump-out was added. |
Step 7. The left wall was added. |
An additional view of step 7. |
Step 8. The right hand wall was added. |
An additional view of Step 8. |
Step 9. The two end walls were added. |
Step 10. The rear wall was added. |
Step 11. The building was attached to the previously completed platform assembly. |
Step 12. The main roof panels were added to the depot. |
Another view of Step 12. |
Roofing will be discussed in the next post.