Tuesday, December 13, 2016

Latest Track Plan

The track plan for the Rio Grande Southern Railroad continues to evolve.  One of my main goals is to provide many opportunities for operation.  This is a facet of the hobby that I have enjoyed more every time I have the chance to operate on a model railroad.

In this current iteration of the track plan, note that the return loop at Ridgway has been eliminated.  Therefore, this railroad will have a point-to-loop design, and will be operated as a point-to-point railroad.  Two branches are not shown on the current plan:  1.  the Telluride Branch, leaving Vance Junction and curving around past Ridgway; and 2.  the Enterprise Branch, which will leave Rico and curve around on a second deck above Dolores.  The prototype Enterprise Branch was a switchback line, with several mines and a mill, which will provide many operating possibilities.  It is also a branch I have not seen modeled often.



Rio Grande Southern Railroad, v2.5.  Track from Dolores  to Ridgway is subject to change.  Note that the Enterprise and Telluride Branches are not shown.


No comments:

Post a Comment