The Enterprise Branch is physically located above the town of Dolores, with a connection to the town of Rico. This branch will be operated by a Shay locomotive, and has several mines, which have been relocated from my previous layout. The Enterprise Branch is freelanced, although it is based upon the prototype Enterprise Branch.
Ridgway, Telluride, and Pandora follow the prototype track plans, although they are compressed, as always seems to be required! We never have all the space we want for our railroads!
Trains are currently operating through Placerville, with the end-of-track at the far end of Placerville. I anticipate beginning benchwork construction of the new portion of the layout within the next week.
The Rio Grande Southern Railroad, as modeled in HOn3. This is the final version of the trackplan. |
No comments:
Post a Comment