![]() |
| View of the Placerville Depot roof showing the weathered effect achieved by lightly spraying the shingles with four colors of paint prior to installation. |
Sunday, January 8, 2017
Placerville Depot completed
I have finished the Placerville Depot, as described two posts ago. As I mentioned previously, this is a laser-cut kit by Narrow Gauge Colorado.
Tuesday, December 13, 2016
Latest Track Plan
The track plan for the Rio Grande Southern Railroad continues to evolve. One of my main goals is to provide many opportunities for operation. This is a facet of the hobby that I have enjoyed more every time I have the chance to operate on a model railroad.
In this current iteration of the track plan, note that the return loop at Ridgway has been eliminated. Therefore, this railroad will have a point-to-loop design, and will be operated as a point-to-point railroad. Two branches are not shown on the current plan: 1. the Telluride Branch, leaving Vance Junction and curving around past Ridgway; and 2. the Enterprise Branch, which will leave Rico and curve around on a second deck above Dolores. The prototype Enterprise Branch was a switchback line, with several mines and a mill, which will provide many operating possibilities. It is also a branch I have not seen modeled often.
In this current iteration of the track plan, note that the return loop at Ridgway has been eliminated. Therefore, this railroad will have a point-to-loop design, and will be operated as a point-to-point railroad. Two branches are not shown on the current plan: 1. the Telluride Branch, leaving Vance Junction and curving around past Ridgway; and 2. the Enterprise Branch, which will leave Rico and curve around on a second deck above Dolores. The prototype Enterprise Branch was a switchback line, with several mines and a mill, which will provide many operating possibilities. It is also a branch I have not seen modeled often.
![]() |
| Rio Grande Southern Railroad, v2.5. Track from Dolores to Ridgway is subject to change. Note that the Enterprise and Telluride Branches are not shown. |
Sunday, December 11, 2016
Placerville Depot
I have begun construction of the Placerville Depot. This kit is produced by Narrow Gauge Colorado, and consists of laser cut parts, stripwood, clear plastic window material, and laser cut roofing. I painted the model with Star-brand paints, available from PBL, specifically D&RGW Trim Brown and D&RGW Jersey Cream. Aleene's Tacky Glue was used for most construction. The photos below show my progress on construction.
Roofing will be discussed in the next post.
![]() |
| Step 1. I began construction by building the platform. This consists of laser cut parts that interlock together. Once the planking was stained with Hunterline Creosote, it was glued to the framework. |
![]() |
| Step 2. The laser cut matboard framework was assembled. |
![]() |
| Another view of the assembled framework. |
![]() |
| Step 4. I began assembly with this wall. |
![]() |
| Step 5. The second wall was added. |
![]() |
| Step 6. The front wall of the bump-out was added. |
![]() |
| Step 7. The left wall was added. |
![]() |
| An additional view of step 7. |
![]() |
| Step 8. The right hand wall was added. |
![]() |
| An additional view of Step 8. |
![]() |
| Step 9. The two end walls were added. |
![]() |
| Step 10. The rear wall was added. |
![]() |
| Step 11. The building was attached to the previously completed platform assembly. |
![]() |
| Step 12. The main roof panels were added to the depot. |
![]() |
| Another view of Step 12. |
Roofing will be discussed in the next post.
Tuesday, November 22, 2016
Touch Toggles Installed
I recently installed the Touch Toggles described in my previous post. I installed two small control panels to house the Touch Toggles, one at each end of Dolores. Also, the Mini-Cup Toggle was installed in the new fascia at the Lost Canon stockpen siding. I found the installation and operation of these controls to be so satisfying, I purchased an additional set to convert a series of turnouts in Durango from accessory decoders to Touch Toggles.
The following parts are required to control a Tortoise switch machine:
1. Power supply
2. Direct Base
3. Touch Toggles
4. Extension cables (optional)
When plugging the cable from the Touch Toggles (or the optional extension cables) into the direct base, pay attention to the orientation of the cable on the pins. Match the location of the brown wire to the pin based upon the small flag-like icon printed on the Direct Base. If plugged in backwards, the Touch Toggles do not throw the turnout, but they will not be damaged.
A single power supply can control multiple direct bases, either by plugging the Direct Bases into each other, or by using extension cables.
Upon powering up the Direct Bases, all turnouts are thrown to the straight-through position. This may be helpful in ensuring the turnouts are thrown for the main line at the beginning of an operating session.
A one-inch hole is required to mount the Mini-CupToggle into the fascia. I used a one-inch Forstner bit, and the Mini-CupToggle was a perfect fit.
A 1 1/2" hole saw is used to cut the hole in the fascia for the three-toggle cup. E-6000 adhesive is used to secure the individual Touch Toggles to the back of the cup. Also, a clear diffuser is included to provide even light.
The following parts are required to control a Tortoise switch machine:
1. Power supply
2. Direct Base
3. Touch Toggles
4. Extension cables (optional)
When plugging the cable from the Touch Toggles (or the optional extension cables) into the direct base, pay attention to the orientation of the cable on the pins. Match the location of the brown wire to the pin based upon the small flag-like icon printed on the Direct Base. If plugged in backwards, the Touch Toggles do not throw the turnout, but they will not be damaged.
A single power supply can control multiple direct bases, either by plugging the Direct Bases into each other, or by using extension cables.
Upon powering up the Direct Bases, all turnouts are thrown to the straight-through position. This may be helpful in ensuring the turnouts are thrown for the main line at the beginning of an operating session.
A one-inch hole is required to mount the Mini-CupToggle into the fascia. I used a one-inch Forstner bit, and the Mini-CupToggle was a perfect fit.
A 1 1/2" hole saw is used to cut the hole in the fascia for the three-toggle cup. E-6000 adhesive is used to secure the individual Touch Toggles to the back of the cup. Also, a clear diffuser is included to provide even light.
![]() |
| A closer view of the panel for Dolores, CO. Note that all indicators are green. This is the status following powering up the Direct Base. |
![]() |
| The Mini-Cup Toggle mounted in the fascia. These are ideal for lone turnouts. |
![]() |
| The Three-Toggle cup mounted in the fascia. |
New 4000-Series boxcars
![]() |
| D&RGW Kitchen Car 04255. Car is shown in front of the Durango Car Shop on the author's layout. |
![]() |
| D&RG 4300 Boxcar, also at the Durango Car Shop. |
![]() |
| D&RGW Water Service car 04432, also at the Durango Car Shop. |
Friday, September 2, 2016
36th National Narrow Gauge Convention
The 36th National Narrow Gauge Convention was held in Augusta, Maine from September 7th through the 10th. There was a mix of Maine two-foot prototypes and models, along with clinics and the Manufacturer's/Vendor room. Most Convention activities took place at the Civic Center. There were three rooms full of modular layouts. I visited the WW&F, and the SR&RL prototype railroads, and several layouts. I am sharing a few pictures of the prototype and modular railroads.
Prototype
![]() |
| Wiscasset, Waterville, and Farmington No. 9. This locomotive has been fully restored. Two-foot locomotives are cute! |
![]() |
| Monson Railroad No. 3, running on the Sandy River & Rangeley Lakes. This is a short run, but we had multiple photo run-bys. |
Models
![]() |
| Denver & RIo Grande Western No. 271, a C-16 class locomotive, beside the Dolores Feed Mill on the Canadian group's Dolores On3 modular layout. |
![]() |
| Rio Grande Southern No. 41 running on the Canadian group's modular layout. This is a new module, connected to their Dolores scene. |
![]() |
| Another view of RGS 41 on the new module. |
Saturday, August 20, 2016
The Wye at Dolores
I have completed installation of the wye at Dolores on my version of the Rio Grande Southern Railroad. I made use of spline sub-roadbed to build smooth, eased curves leading into the wye, as well as the curved tracks of the wye itself. I used 3/16" thick lauan plywood to construct the wye. I cut leftover scrap lauan plywood into 1/2" wide by 8 foot long strips. These strips were laminated together to form the sub-roadbed. I am using 2" wide sub-roadbed to support Homasote roadbed made by Cascade Rail Supply. This roadbed is supplied in two pieces, allowing curves to be made easily. The two-piece construction makes a solid sub-roadbed very desirable. I found that it required 11 strips of the lauan plywood, laminated together, to achieve the desired width.
As with Dolores, I chose to control the turnouts using Berrett Hill Trains Touch Toggles. I used a DCC Specialties OG-AR Auto Reverser salvaged from my previous layout to automatically change the polarity of the rails as the train is turned. The OG-AR has been replaced by the PSX-AR.
As with Dolores, I chose to control the turnouts using Berrett Hill Trains Touch Toggles. I used a DCC Specialties OG-AR Auto Reverser salvaged from my previous layout to automatically change the polarity of the rails as the train is turned. The OG-AR has been replaced by the PSX-AR.
![]() |
| The unfinished end of the laminated roadbed. The varying lengths of the lauan plywood strips is shown. This allows additional strips to be easily added. |
![]() |
| THe end of the wye, showing the Cascade Rail Supply two-piece Homasote roadbed. I marked the center strip of lauan plywood to ease installation of the roadbed. |
![]() |
| It takes a lot of clamps to glue the strips together! |
![]() |
| This is a small, inexpensive level available at local home centers. I used this to ensure the track was level from side-to-side, and that a consistent uphill grade was achieved. |
Subscribe to:
Posts (Atom)




































